Search
Filters

“THPS: A Review of the First 25 Years Lessons Learned Value Created and Visions for the Future"

Product Number: 51312-01505-SG
ISBN: 01505 2012 CP
Author: Chris R. Jones
Publication Date: 2012
$0.00
$20.00
$20.00

Since its first application in the UK sector of the North Sea in the late 1980’s THPS has established a “best-in-class” status for the control of problematic sulphate reducing bacteria (SRB) and the operational problems associated with their metabolic activity. This paper will review how THPS technology has been developed and enhanced to meet new industry needs will compare and contrast the various different “THPS generations” currently available on the market will discuss and describe case studies and best practices for the control of reservoir souring iron sulfide schmoo and microbially influenced corrosion (MIC) and will provide insights into new control strategies applications and efficacy data against challenging new organisms such as archaea. Key Words: THPS SRB Reservoir Souring Iron Sulfide Schmoo MIC Archaea

Since its first application in the UK sector of the North Sea in the late 1980’s THPS has established a “best-in-class” status for the control of problematic sulphate reducing bacteria (SRB) and the operational problems associated with their metabolic activity. This paper will review how THPS technology has been developed and enhanced to meet new industry needs will compare and contrast the various different “THPS generations” currently available on the market will discuss and describe case studies and best practices for the control of reservoir souring iron sulfide schmoo and microbially influenced corrosion (MIC) and will provide insights into new control strategies applications and efficacy data against challenging new organisms such as archaea. Key Words: THPS SRB Reservoir Souring Iron Sulfide Schmoo MIC Archaea

Product tags
Also Purchased
Picture for 00001 EFFECT OF ANIONS AND CATIONS ON THE PIT
Available for download

00001 EFFECT OF ANIONS AND CATIONS ON THE PIT INITIATION IN CO2 CORROSION OF IRON AND STEEL

Product Number: 51300-00001-SG
ISBN: 00001 2000 CP
Author: G. Schmitt and S. Feinen
$0.00
Picture for 00005 PROTECTIVE PROPERTIES OF CRUDE OILS
Available for download

00005 PROTECTIVE PROPERTIES OF CRUDE OILS IN CO2 AND H2S CORROSION

Product Number: 51300-00005-SG
ISBN: 00005 2000 CP
Author: Marta Castillo, Hern~in Rincon, Simona Duplat, Jose Vera, Evaristo Baron
$0.00
Picture for 00012 Aggressive CO2 Corrosion and Fatigue
Available for download

00012 Aggressive CO2 Corrosion and Fatigue Behavior of Pipeline Girth Welds

Product Number: 51300-00012-SG
ISBN: 00012 2000 CP
Author: K. E. Szklarz
$0.00