Search
Filters

SP0111-2019, “Coating Technical File in Accordance with the IMO Performance Standard for Protective Coatings”

The coating technical file (CTF) contains documentation relevant to the selection, specification, installation, and inspection of coatings applied to a ship’s seawater ballast tanks and double-skin spaces. It also contains documentation of in-service maintenance and repair of coating system(s). PRINTED HARD COPIES REQUIRE A MINIMUM OF 7-10 DAYS FOR PROCESSING BEFORE SHIPPING.

Product Number: 21153-PRINTED HARD COPY
ISBN: 1-57590-245-1
Publication Date: 2019
Industry: Maritime
$69.00
$69.00
$69.00

The coating technical file (CTF) contains documentation relevant to the selection, specification, installation, and inspection of coatings applied to a ship’s seawater ballast tanks and double-skin spaces. It also contains documentation of in-service maintenance and repair of coating system(s). These requirements originate in the International Maritime Organization (IMO)’s(1) “Performance Standard for Protective Coatings for Dedicated Seawater Ballast Tanks in All Types of Ships and Double-Side Skin Spaces of Bulk Carriers” (PSPC),1 Paragraph 3.4, Coating Technical File (CTF). PRINTED HARD COPIES REQUIRE A MINIMUM OF 7-10 DAYS FOR PROCESSING BEFORE SHIPPING.

 

Key words:  Marine, Ballast, IMO , MEPC 59/2/16, BWTS, Coating, Ships, Technical File, CTF, MSC.215(82),  PSPC, TG 402, STG 44

The coating technical file (CTF) contains documentation relevant to the selection, specification, installation, and inspection of coatings applied to a ship’s seawater ballast tanks and double-skin spaces. It also contains documentation of in-service maintenance and repair of coating system(s). These requirements originate in the International Maritime Organization (IMO)’s(1) “Performance Standard for Protective Coatings for Dedicated Seawater Ballast Tanks in All Types of Ships and Double-Side Skin Spaces of Bulk Carriers” (PSPC),1 Paragraph 3.4, Coating Technical File (CTF). PRINTED HARD COPIES REQUIRE A MINIMUM OF 7-10 DAYS FOR PROCESSING BEFORE SHIPPING.

 

Key words:  Marine, Ballast, IMO , MEPC 59/2/16, BWTS, Coating, Ships, Technical File, CTF, MSC.215(82),  PSPC, TG 402, STG 44