Search
Filters
Close

Save up to 75% off Clearance Books.  No promo code needed.  Shop Now

SP0208-2008 (Chinese) Internal Corrosion Direct Assessment Methodology for Liquid Petroleum Pipelines

Sorry - this product is no longer available

液体石油 管道内腐蚀直接评价方法    

Liquid petroleum internal corrosion direct assessment (LP-ICDA) method: (1) pre-assessment, (2) indirect assessment, (3) direct examination, and (4) post assessment. P

RINTED HARD COPIES REQUIRE A MINIMUM OF 7-10 DAYS FOR PROCESSING BEFORE SHIPPING.

Product Number: 21163-PRINTED HARD COPY
ISBN: 1-57590-221-4
Publication Date: 2008
$99.00
$99.00
$99.00

Describes the basis of the liquid petroleum internal corrosion direct assessment (LP-ICDA) method and its four steps: (1) pre-assessment, (2) indirect assessment, (3) direct examination, and (4) post assessment. With the LP-ICDA approach, assessments can be performed on pipe segments for which alternative methods (e.g., in-line inspection, hydrostatic testing, etc.) may not be practical. This methodology may be incorporated into corrosion integrity and risk management plans.

PRINTED HARD COPIES REQUIRE A MINIMUM OF 7-10 DAYS FOR PROCESSING BEFORE SHIPPING.

Key words: liquid petroleum internal corrosion, direct assessment, pipelines.

Describes the basis of the liquid petroleum internal corrosion direct assessment (LP-ICDA) method and its four steps: (1) pre-assessment, (2) indirect assessment, (3) direct examination, and (4) post assessment. With the LP-ICDA approach, assessments can be performed on pipe segments for which alternative methods (e.g., in-line inspection, hydrostatic testing, etc.) may not be practical. This methodology may be incorporated into corrosion integrity and risk management plans.

PRINTED HARD COPIES REQUIRE A MINIMUM OF 7-10 DAYS FOR PROCESSING BEFORE SHIPPING.

Key words: liquid petroleum internal corrosion, direct assessment, pipelines.