SP0297-2012 Maintenance Painting of Electrical Substation Apparatus Including Flow Coating of Transformer Radiators

Painting electrical equipment to protect it from the detrimental effects of corrosion and help extend its operating life. PRINTED HARD COPIES REQUIRE A MINIMUM OF 7-10 DAYS FOR PROCESSING BEFORE SHIPPING.

 

Product Number: 21081-PRINTED HARD COPY
ISBN: 1-57590-042-4
Publication Date: 2012
$69.00
$69.00
$69.00

A guide for maintenance personnel for utilities and large industrial concerns who are responsible for painting electrical equipment.  Use of the standard is intended to help protect equipment from the detrimental effects of corrosion and help it perform to the fullest extent of its operating life. PRINTED HARD COPIES REQUIRE A MINIMUM OF 7-10 DAYS FOR PROCESSING BEFORE SHIPPING.

 

Key words:  coatings, measurement, transformer radiators

A guide for maintenance personnel for utilities and large industrial concerns who are responsible for painting electrical equipment.  Use of the standard is intended to help protect equipment from the detrimental effects of corrosion and help it perform to the fullest extent of its operating life. PRINTED HARD COPIES REQUIRE A MINIMUM OF 7-10 DAYS FOR PROCESSING BEFORE SHIPPING.

 